Contractor’s Bid with Materials
Circle Engineers Limited is a reputable company experienced in the construction of high-rise residential buildings. The first party, being the landowner, desires to construct a multi-storied (_____) building and wishes to engage Circle Engineers Limited as the contractor to execute the work based on the following terms and conditions, with the supply of necessary materials.
Work Rate List
| Serial No. | Description | Rate (BDT/SFT) |
|---|---|---|
| 01 | Earthwork excavation, pile cap work up to Grade beam. (Excluding boundary work). All concreting will be stone aggregate. Measurement will be based on outer dimensions of footing. | 2050 |
| 02 | From base beam to the first slab (only column concreting with stone aggregate). All other concreting will use chips. Excluding boundary wall. | 2500 |
| 03 | Subsequent slabs after the first (column, beam, and slab concreting with stone aggregate). All other concreting will use chips. | 2500-3000 |
| 04 | From the first (1st) to the fifth (5th) slab, the same rate will apply. There will be a 50 BDT increase per slab for subsequent floors. | 2550-3050 |
| 05 | Roof tank, stairs, lift core, etc. | 1500 |
| 06 | Basement and underground reservoir work. | Negotiable |
Note:
- For all stone aggregate concreting, there will be an additional charge of 100 BDT per square foot.
- For tree removal during construction, a charge of 3000 BDT per tree will apply.
- The rates include scaffolding, formwork, electrical conduits, and wiring, which are necessary for the completion of the project.
Piling Rates:
| Diameter | Rate (BDT/RFT) |
|---|---|
| 16”-18” | 1700 |
| 20” | 1800 |
| 24” | 1900 |
Payment Schedule for the Contractor:
| Stage | Percentage Payment |
|---|---|
| After earth excavation work up to the base beam | 100% |
| Before starting column work on each floor | 40% |
| Before slab concreting on each floor | 30% |
| Before starting brickwork | 20% |
| Upon completion of plastering work | 3% |
| Upon final finishing and painting work completion | 7% |
Note: Upon the completion of the contract, an additional 5 lakh to 20 lakh BDT will be paid as a lump sum amount.
Building Material Specifications:
- Stone Aggregates: The following types of stones will be used in construction: 3/4”, 5/8” local and imported chips, boulders, etc.
- Cement: Standard brands such as Shah Cement, Premier Cement, Crown Cement, or equivalent will be used for the project.
- Steel: 60/72 grade steel bars from brands like BSRM, KSRM, AK Steel, or equivalent will be used.
Bathroom Specifications:
- Master Bathroom:
- The walls will be fully tiled with ceramic tiles (RAK or equivalent, 12×20 inches).
- The floors will be fully tiled with ceramic tiles (RAK or equivalent, 12×12 inches).
- High-quality sanitary fittings (RAK or equivalent) will be used.
- Concealed commode (RAK or equivalent).
- Shower panel, soap dish, copper towel holder of high quality.
- Proper lighting system will be installed, including glass shelves with mirrors. Additional plug points will also be provided.
- Common Bathroom:
- The walls will be fully tiled with ceramic tiles (RAK or equivalent, 12×20 inches).
- The floors will be fully tiled with ceramic tiles (RAK or equivalent, 12×12 inches).
- High-quality bathroom fittings (Shower, basin, etc. from renowned brands).
- Flush door (RAK or equivalent).
- Sanitary fittings will be provided with an additional plug point for convenience.
- High-quality fittings like taps and showers will be installed.
- A proper water supply connection will be available.
Flooring (Collar):
- The floors will be tiled with 24×24-inch high-quality tiles (RAK or equivalent).
- Stairs and lobby areas will be covered with tiles from reputable brands (RAK or equivalent).
Walls:
- External walls will have 5″/10″ plaster surfaces following first-class specifications.
- Internal partition walls will have 5″ plastered surfaces, following the same standards.
- The roof will have parapet walls built according to the design.
- Separating walls will be built using 5″/10″ first-class bricks, following design requirements.
Kitchen:
- The kitchen countertop will be tiled with durable ceramic tiles.
- Gas connections will be made available with double burners.
- Stainless steel double bowl sinks will be installed.
- Wall tiles (RAK or equivalent) will cover the kitchen walls.
- Electrical outlets will be provided for all kitchen appliances.
- Kitchen floors will be tiled with high-quality ceramic tiles.
Painting & Finishing:
- The entire exterior will be painted with high-quality plastic or enamel paint.
- Interior walls and ceilings will be painted using first-class materials (Berger or equivalent).
- Bathroom ceilings will have mold-resistant emulsion paint.